866.684.7325   

Warden™

Warden

CLICK HERE FOR PRINTABLE VERSION

The Peak Completions Warden™ Frac Plug is an all-composite body frac plug for temporary zonal isolation in both vertical and horizontal wells. The Warden™ uses our proprietary MPS™ Slip Technology and can be deployed on wireline or tubing using conventional pump-down methods.

In the Frac plug version, the hollow core remains open to allow wireline pump down work to continue above. A ball is then dropped from the surface and pumped down until it seats on the tool. Once the ball is seated, the operator can pressure up against the plug, creating zonal isolation.

The Warden™ features a patent pending design and our proprietary MPS™ Slip Design. MPS™ stands for Managed Particle Size and is a novel convention in slip design, eliminating large slip components and reducing the risk of sticking a drill out BHA. Our MPS™ technology combined with our extensive experience and expertise provides a smooth, quick drill out using either conventional tubing or coiled tubing.

The Warden™ can also be configured as a caged ball frac plug or bridge plug using a field-adjustable screw-in adapter. If faster pump-down speeds are required, the Warden allows the addition of a pump-down ring.

PRODUCT HIGHLIGHTS

  • All Composite Construction with MPS™ Slip Technology
  • Compact size provides easy installation
  • Anti-preset setting equipment prevents plug from setting while running in the hole
  • Shear sleeve adapter allows ball to be run in place or dropped from surface
  • Allows flowback from below the plug
  • Drill out times of 10 - 15 minutes or less
  • Economical Design and In-House Manufacturing Controls
  • Bulk Delivery Discounts Available

SETTING ADAPTER KIT

The Warden™ is set with a universal setting sleeve and shear sleeve adapter. The setting kits can be run on any wireline setting tool or tubing run hydraulic setting tool with either Baker #10, Baker #20 or 3½ GO connections. The tool’s antipreset design keeps plug from setting while running in hole.

 

 

CASING OD OVERALL LENGTH CASING WEIGHT MIN ID

MAX CASING ID

TOOL OD

BALL DROP SIZE

OPERATING RANGE

SETTING TOOL

4 ½” 20.06" 9.5-13.5# 3.826” 4.090” 3.660” 2.000” 10K psi / 350º F Baker #10 / Owen Compact
4 ½” 20.06" 15.1-17.1# 3.650” 3.826” 3.440” 2.000” 10K psi / 350º F Baker #10 / Owen Compact
5" 20.06" 18-23.2# 3.875" 4.276 3.670" 2.000” 10K psi / 350º F Baker #10 / Owen Compact
5 ½” 20.06" 15.5-23# 4.580” 5.044” 4.370” 2.000” 10K psi / 350º F Baker #20 / Owen Compact
5 ½” 20.06" 23-26# 4.500" 4.700” 4.250” 2.000” 10K psi / 350º F Baker #20 / Owen Compact

Kronos™

Kronos

CLICK HERE TO VIEW ANIMATION

CLICK HERE FOR PRINTABLE VERSION

The Kronos™ dissolvable isolation tool is a revolutionary pump-down baffle that dissolves in low temperature, low salinity, even fresh water wellbore environments. Like the plug and perf method, it is placed in the casing string using a conventional Baker or Go Shorty Hydraulic Setting Tool on wireline. This patent-pending tool is the latest technology developed by Peak Completions.

This tool is used with Peak’s proprietary line of Fantom™ dissolvable frac balls and eliminates the need to mill out after treatment. The Kronos™ allows an unrestricted flowback of the reservoir and wellbore, as well as full 10,000 psi differential between stages.

The Kronos™ isolates the stage above it by using a large OD frac ball placed where the conventional composite plug would normally be. Once the Kronos™ and ball are introduced to wellbore fluid, both components begin to degrade. After a successful zonal isolation the result is a full ID unrestricted wellbore eliminating remediation and allowing immediate production.

The Kronos™ tool is formulated using the same dissolvable technology derived from Peak's successful F4 Fantom™ line, resulting in repeatable consistent degradation backed up by years of proven run history.

PRODUCT HIGHLIGHTS

  • Engineered blends suited for degradation in all temperature ranges
  • Dissolution with no salinity or fluid circulation required
  • Full 10,000 psi bottom-hole differential pressure between stages
  • Eliminates the need for wellbore remediation after installation
  • Isolates the stage above with dissolvable frac ball
  • Conventional wireline deployment

DESIGN FEATURES

  • Simplistic three piece design
  • High strength compact construction
  • Tool body and elastomer dissolve at the same rate
  • Integrated anti-preset design
  • Minimal material composition

TECHNICAL SPECIFICATIONS

 

 

PRODUCT NUMBER SIZE WEIGHT RANGE OD

ID

BURST

OVERALL LENGTH

2050-35A-A94 3-1/2" 9.2# 2.750" 0.625" 10,000 psi 5.924"
2050-45A-A00 4-1/2” 9.5# 3.813” 1.000” 10,000 psi 7.350”
2050-45B-A00 4-1/2” 10.5# 3.781” 1.000” 10,000 psi 7.350”
2050-45C-A00 4-1/2” 11.6# 3.750” 1.000” 10,000 psi 7.350”
2050-45D-A00 4-1/2” 13.5# 3.656” 1.000” 10,000 psi 7.350”
2050-45E-A00 4-1/2” 15.1# 3.563” 1.000” 10,000 psi 7.350”
2050-50A-A00 5" 15# 4.125” 1.000” 10,000 psi 7.350”
2050-50B-A00 5" 18# 4.000” 1.000” 10,000 psi 7.350”
2050-50C-A00 5" 21.4# 3.875” 1.000” 10,000 psi 7.350”
2050-55A-A00 5-1/2” 15.5# 4.750” 1.500” 10,000 psi 8.693”
2050-55B-A00 5-1/2” 17# 4.625” 1.500” 10,000 psi 8.693”
2050-55C-A00 5-1/2” 20# 4.500” 1.500” 10,000 psi 8.693”
2050-55D-A00 5-1/2” 23# 4.375” 1.500” 10,000 psi 8.693”
2050-55E-A00 5-1/2” 26# 4.219” 1.500” 10,000 psi 8.693”

FracDart™

FracDart

CLICK HERE FOR PRINTABLE VERSION

The Peak Completions’ FracDart™ Frac Plug is an all-composite body frac plug for temporary zonal isolation in both vertical and horizontal wells. The plug uses our proprietary MPS™ Slip Technology and can be deployed on wireline or tubing using conventional pump-down methods.

Once set, the large inner diameter hollow core remains open to allow wireline operators to continue work above. A ball is then dropped from the surface and pumped down until it seats on the tool. Once the ball is seated, the operator can pressure up against the plug, creating zonal isolation. Using Peak’s patent-pending technology, our engineers are able to use the absolute minimum amount of material, maximize the ID and use 70% of the required volume of composite material compared to all competitor’s composite plugs.

The FracDart™ features a patent-pending design and our proprietary MPS™ Slip Design. MPS™ stands for Managed Particle Size and is a novel convention in slip design, eliminating large slip components and reducing the risk of sticking a drill out BHA. Our MPS™ technology combined with our extensive experience and expertise provides a smooth, quick drill out using either conventional tubing or coiled tubing.

PRODUCT HIGHLIGHTS

  • All Composite Construction with MPS™ Slip Technology
  • Compact size provides easy installation and minimizes total material
  • Anti-preset setting equipment prevents plug from setting while running in the hole
  • Allows flowback from below the plug through Large ID compared to standard frac plugs
  • Drill out times of 5 - 10 minutes or less
  • Less than 15” Overall Length in set position
  • 500+% more flow area through large ID than comparable composite frac plugs
  • Large Inner Diameters help to aid in cleanup of screen outs
  • Better Ball Action during frac jobs due to reduction of pressure drop through ID when displacing frac ball to seat
  • Peak’s Most Economical Design
  • Bulk Delivery Discounts Available

 

TECHNICAL SPECIFICATIONS

CASING OD OVERALL LENGTH CASING WEIGHT TOOL ID

TOOL OD

BALL DROP SIZE

OPERATING RANGE

SETTING TOOL

4 ½” 17.13" 10.5-11.6# 1.500" 3.656" 1.750" 7.5K psi / 350° F Baker #10 / 3½” GO
4 ½” 17.13" 11.6-13.5# 1.500" 3.656" 1.750" 7.5K psi / 350° F Baker #10 / 3½” GO
4 ½” 17.13" 13.5-15.1# 1.500" 3.531" 1.750" 7.5K psi / 350° F Baker #10 / 3½” GO
5” 17.13" 15.0-18.0# 1.625" 4.000" 1.875" 7.5K psi / 350° F Baker #10 / 3½” GO
5” 17.13" 18.0-21.4# 1.625" 3.875" 1.875" 7.5K psi / 350° F Baker #10 / 3½” GO
5 ½” 18.38" 15.5-17.0# 2.375" 4.625" 2.625" 7.5K psi / 350° F Baker #20 / 3½” GO
5 ½” 18.38" 17.0-20.0# 2.375" 4.500" 2.625" 7.5K psi / 350° F Baker #20 / 3½” GO
5 ½” 18.38" 20.0-23.0# 2.375" 4.375" 2.625" 7.5K psi / 350° F Baker #20 / 3½” GO

SETTING ADAPTER KIT

The FracDart™ is set with a universal setting sleeve and shear sleeve adapter. The setting kits can be run on any wireline setting tool or tubing run hydraulic setting tool with either Baker #10, Baker #20 or 3½ GO connections. The tool’s antipreset design keeps plug from setting while running in hole.