The P218 Pump-Out Cementing Sleeve is used for cementing liner strings in the well bore usually run above the P440 Casing Packer.
The P218 Pump-Out Cementing Sleeve is run above the P440 Casing Packer, once the Casing Packer is set (tension or compression) the P218 is activated by gravitating a ball into the lower seat, applied pressure shifts lower seat and opens port holes for cementing. After the cementing operation is completed, pump the wiper plug into the upper seat and apply pressure to shift the closing sleeve over the port holes. Final pressure of 2500 PSI will pump out all internal parts of the P218 Pump-Out Cementing Sleeve.
FEATURES:
TUBING SIZE | MAX O.D. | MIN I.D. @ PUMP-OUT | THREAD CONNECTION | PRODUCT NUMBER | ||||
in | mm | in | mm | in | mm | in | mm | |
2.38 | 60.3 | 3.125 | 79.4 | 2.000 | 50.80 | 2.38 EUE 8RD | 60.3 | T218-20A-000 |
2.88 | 73.0 | 3.750 | 95.25 | 2.500 | 63.50 | 2.88 EUE 8RD | 733 | T218-25A-000 |
3.50 | 88.9 | 4.500 | 114.3 | 3.000 | 76.20 | 3.5 EUE 8RD | 88.9 | T218-35A-000 |
4.00 | 101.6 | 4.625 | 117.47 | 3.453 | 87.70 | 4.0 NU 8RD | 101.6 | T218-40A-000 |
4.50 | 114.3 | 5.500 | 139.7 | 4.000 | 101.6 | 4.5 8RD CSG | 114.3 | T218-45A-000 |
5.50 | 139.7 | 6.500 | 165.1 | 5.000 | 127.0 | 5.5 8RD CSG | 139.7 | T218-55A-000 |